Kostolná

The Kostolná hydroelectric power plant is the first power plant on the second (historically fourth) diversion channel. All the HPP´s on this channel are built for the same parameters, therefore they also have the same installed capacity of 25.5 MW each. A turbine flow is 90 m3.sec-1, i.e. 180 m3.sec-1 on aggregate for the plant, since each HPP has two sets each throughout the cascade.

Category

canal

Installed capacity MW

25,5

Stream

Váh

Type of turbine

Kaplan

Flow rate m3.sec-1

2x 90

Number of turbo-sets

2

Commissioned in

1953

Aver. annual generation GWh 

114,6