Mošoň

400 kV rozvodňa VE Gabčíkovo

As is the case with the Čuňovo HPP, also the small HPP Mošoň is covered by the alternate solution to putting the Gabčíkovo water work into operation. At the plant there are installed two sets having a direct-flow Kaplan turbine, with waste waters feeding the Mošoň branch of the Danube river.

This power plant was operated by Slovenské elektrárne until 10 March 2015, when the operation was taken over by Vodohospodárska výstavba, a 100% state owned Slovak company.

Category

run-of-river

Installed capacity MW

1,22

Stream

Dunaj

Type of turbine

Kaplan - horizontal

Flow rate m3.sec-1

2x 10

Number of turbo-sets

2

Commissioned in

1994

 Aver. annual generation GWh

4,3