Nové Mesto nad Váhom

VE Nové Mesto n. Váhom

The Nové Mesto nad Váhom hydroelectric power plant is the second HPP in order on the diversion channel, with its technical parameters being the same as at the Kostolná HPP. As the Trenčianske Biskupice weird has a low retention capacity, the operation of this cascade is hydraulically closely linked to that of the previous cascade.

Category

canal

Installed capacity MW

25,5

Stream

Váh

Type of turbine

Kaplan

Flow rate m3.sec-1

2x 90

Number of turbo-sets

2

Commissioned in

1953

Aver. annual generation GWh 

113,8