| Owner | Slovenské elektrárne, a.s |
| Country / District | Slovak Republic, Trenčín region / district Prievidza |
| Type of park | Brownfield industrial park with space, technology, buildings and robust industrial infrastructure. |
| Zoning plan | The premises are run as an industrial area, warehouses and sludge pot. |
| Area | A total of 280 hectares, including 80 hectares of industrial park area and 200 hectares of sludge pot. |
| Current coverage of premises by buildings | ~50 % |
| Rail | The length of the railway siding is 18.5 km with 52 switches. The railway siding is located within and outside the plant site (approx. 50:50). The operation of the railway siding is divided into a connection to the national railway and a siding at the ENO. The existing connection of the SE ENO siding to the national railway is located at the railway station Zemianske Kostoľany; there is a connection to the siding of Hornonitrianske bane Prievidza, a.s. (HBP), there is a connection of the HBP siding to the national railway line and a connection to the siding of Fortischem Nováky (currently unused). |
| Road connection | Connection to the I/64 road, the R2 speed road is still in preparation |
| Selected technical parameters power plant infrastructure | B1 ENO B Parameters 350 t/h; 13.63 MPa; 540 °C B2 ENO B Parameters 350 t/h; 13.63 MPa; 540 °C ENO A, FK Parameters 125 t/h; 9.6 MPa; 540 °C One diesel boiler available (spare source) with parameters 21,20 t/h; 0,7 MPa; 270 °C. |
| Electricity / substations to connect | 110 kV substation: ENO B (output to SSD Bystričany), ENO A (ENO self-consumption, possibility of new connections) 6kV substation ENO A (ENO self-consumption, possibility of new connections) |
| IT and communication | Optical and metallic network - own wiring in the area Mobile connection of operators Optical network on 100 kV lines (ENERGOTEL) Metallic network underground cable Telekom, BTS Telekom, O2, Orange |
| Drinking water | The main drinking water and domestic water supply pipes are two parallel pipes. The operator of the main water supply system is Stredoslovenská vodárenská vodárenská prevádzková společnost. Drinking water distribution is throughout the ENO building. The annual consumption before the shutdown was 90 thous. m3. |
| Raw water | Water is supplied from Nováky. The 2 x DN 1000 route leads to the handling hub (shaft 15) and from there it is distributed around the plant. It is used as fire water (DN 400 - DN 100) and filtered water in the production process (DN 300 - DN 150). The annual consumption of surface water was 6-7,5 million m3 during the operation of the plant. |
| Sewerage and storm water drainage | There are 16 WWTPs located along the site. From the WWTP, the cleaned water flows through the sewage pipelines located in the locality into the old arm of the Nitra River, the Roháč stream and the Hraničný stream. The number of inlet and connection manholes on the sewerage system is 273. The total length of the sewerage system is about 8453 m. |
| Compressed air | compressor stations and on-site distribution lines |
| Natural gas | A natural gas connection is not currently available at the ENO plant. However, the route of the high-pressure gas pipeline is located close to ENO, in the south at the beginning of the village Zemianske Kostoľany, approximately 500 m from ENO, and in the west behind the river Nitra, approximately 600 m from ENO. Parameters of the high-pressure pipeline: pipeline DN 300, PN 25, outlet gas pressure 1,56 - 2,2 MPa. |