About power plant

Aimed to balance run-offs from peak-load operation of the Orava HPP, the small hydroelectric power plant was constructed by the Tvrdošín balancing reservoir. The smaller of the turbo-generators has a maximum usable flow of 5 m3sec-1, i.e. as much as required by the biological flow rate in the Orava river downstream the Orava water work, therefore it is in operation almost continuously. The larger turbo-generators are operated when inflows into the Orava reservoir are higher.
Zobraziť viac
MVE TvrdošínMVE TvrdošínMVE TvrdošínMVE Tvrdošín
  • MVE Tvrdošín
  • MVE Tvrdošín
  • MVE Tvrdošín
  • MVE Tvrdošín

Deeper insight

Technical parameters
Category
dam - run-of-river
Installed capacity MW
6,1 MW
Stream
Orava
Type of turbine
Kaplan – horizontal
Flow rate
2x30 + 1x5 m3.s-1
Number of turbo-sets
3
Commissioned in
1979
Aver. annual generation GWh
18,02 GWh