Rakovec HPP

About power plant

Commissioned in 1912, the Rakovec small HPP is the oldest of Slovenské elektrárne hydroelectric power plant. There are two sets featuring a Francis turbine installed at it and the entire basic technologic equipment is original.
Zobraziť viac
VE_Rakovec02_312x153
  • VE_Rakovec02_312x153

Deeper insight

Technical parameters
Category
reservoir
Installed capacity MW
0,5 MW
Stream
Hnilec
Type of turbine
Francis
Flow rate
n/a
Number of turbo-sets
2
Commissioned in
1912
Aver. annual generation
0,633 GWh