Nové Mesto nad Váhom HPP

About power plant

The Nové Mesto nad Váhom hydroelectric power plant is the second HPP in order on the diversion channel, with its technical parameters being the same as at the Kostolná HPP. As the Trenčianske Biskupice weird has a low retention capacity, the operation of this cascade is hydraulically closely linked to that of the previous cascade.
Zobraziť viac

Deeper insight

Technical parameters
Category
canal
Installed capacity
25,5 MW
Stream
Váh
Type of turbine
Kaplan
Flow rate
2x90 m3.s-1
Number of turbo-sets
2
Commissioned in
1953
Aver. annual generation
113,8 GWh