Kostolná HPP

About power plant

The Kostolná hydroelectric power plant is the first power plant on the second (historically fourth) diversion channel. All the HPP´s on this channel are built for the same parameters, therefore they also have the same installed capacity of 25.5 MW each. A turbine flow is 90 m3.sec-1, i.e. 180 m3.sec-1 on aggregate for the plant, since each HPP has two sets each throughout the cascade.
Zobraziť viac

Deeper insight

Technical parameters
Category
canal
Installed capacity
25,5 MW
Stream
Váh
Type of turbine
Kaplan
Flow rate
2x90 m3.s-1
Number of turbo-sets
2
Commissioned in
1953
Aver. annual generation
114,6 GWh