Považská Bystrica HPP

About power plant

The Považská Bystrica hydroelectric power plant is the last stage on this diversion channel and the water used is drained into the Nosice reservoir, in which the HPP discharge channel merges with the Váh riverbed.
Zobraziť viac

Deeper insight

Technical parameters
Category
canal
Installed capacity
55,2 MW
Stream
Váh
Type of turbine
Kaplan
Flow rate
3x134 m3.s-1
Number of turbo-sets
3
Commissioned in
1964
Aver. annual generation
115,3 GWh