Vojany Black Coal Power Plant

About power plant

Thermal power plant Vojany is situated in the Eastern Slovakia in the district of Michalovce in the proximity of the Slovak-Ukrainian border. It ceased operation in March 2024. After the end of electricity generation, the process of closing this power plant began. It consists of several phases, the first is securing and bringing the plant to a safe and environmentally friendly state. This will be followed by various remediation and reclamation of ecological burdens. We are currently looking for further use for the power plant area, whether it is the construction of renewable energy sources, battery storages, in the future perhaps small modular reactors, the production of green hydrogen or the use of already stored ash on the sludge bed and its further processing for construction needs. We plan to invest more than EUR 20,000,000 in these green solutions in the short term.
Zobraziť viac
Elektrárne VojanyElektrárne VojanyElektrárne VojanyElektrárne VojanyElektrárne VojanyElektrárne VojanyElektráreň VojanyElektrárne VojanyElektrárne VojanyElektrárne VojanyElektrárne VojanyElektrárne VojanyElektrárne VojanyElektrárne Vojany
  • Elektrárne Vojany
  • Elektrárne Vojany
  • Elektrárne Vojany
  • Elektrárne Vojany
  • Elektrárne Vojany
  • Elektrárne Vojany
  • Elektráreň Vojany
  • Elektrárne Vojany
  • Elektrárne Vojany
  • Elektrárne Vojany
  • Elektrárne Vojany
  • Elektrárne Vojany
  • Elektrárne Vojany
  • Elektrárne Vojany

Deeper insight

History
Technical parameters

1960

Approval of the construction of EVO I

1961

Start of construction of EVO I

1966

Commissioning of the EVO I units

1966

Approval of the construction of EVO II

1968

Start of construction of EVO II

1974

EVO II commissioning

1997 - 2000

Ecologisation of Units 1 – 4 EVO II, installation of low-emission burners to reduce nitrogen oxides

1997 - 2001

Ecologisation of Units 1 and 2 EVO I, desulphurization and denitrification

1997 - 2001

Ecologisation of Units 5 and 6 EVO I – fluidized combustion

1997

Dismantling of the originally 306 m high chimney to 170 meters

2001

Commissioning of the fluidised bed boiler on Units 5 and 6 of EVO I

2006

Termination of operation of Units 3 and 4 EVO I and Units 5 and 6 of EVO II

2008

Termination of operation of Units 1 – 4 EVO II

2009 - 2010

Co-firing of wood chips in the fluidised bed boiler of Units 6 EVO I – stage I

2009

Fire at Unit 5 EVO I

2009 - 2012

Reconstruction of Unit 5 EVO I after fire

2010

Commissioning of photovoltaics

2011 - 2012

Co-firing of wood chips on the fluidised bed boiler of unit no. 5 EVO I – stage II

2015

Regulatory power range of units extended to 40 – 110 MW

2015

Biodegradable waste co-incineration test

2015

Termination of operation of Units 1 and 2

2015 - 2016

Black start test

March 2024

End of electricity production from fossil fuels
VOJANY I

Vojany I EVO I installed capacity
220 MW
Number of units
2
Fuel
black semi-anthracite coal (T-coal)
Boilers 5 and 6: single-drum with natural circulation and circulating fluidised bed

Capacity
325,4 t/hod
Output steam pressure
14,6 Mpa
Construction commencement
1997
Commissioned
2001